Skip to main content

MALAGA AND COSTA DEL SOL: GREAT TOURIST AREA, WORRYING WASTEWATER PURIFICATION

malaga, costa del sol, sewage, properties
The wastewater purification in Malaga, financial and environmental consequences

With this article, I am detracting from the usual ones of a more legal nature, aimed at foreigners, resident or non-resident, who own a home in Malaga. In this post, I attempt to analyse the situation of wastewater purification in terms of the most significant tourist municipalities in Costa del Sol, as well as the financial and environmental consequences that lack of purification entails for municipalities like Nerja and Coín. I also focus on properties on rural land and the purification required for homes wishing to obtain a DAFO.

Introduction wastewater purification

With environmental sustainability or the environmental impact of our lifestyles being such an important issue in our times, I would like to speak my mind about the great problem of faecal water purification in the province of Malaga in general, even through it is sadly extensible to most regions in Spain, in population centres both large and small. However, Malaga, as a top tourist destination and due to its population density, especially along the coastline, should have an infrastructure that mitigates the environmental impact caused by all of us who live on the shore.

Many of our clients, both resident and non-resident, who are thinking about purchasing a home in Andalusia and that we provide advice to, are attracted by the Mediterranean Sea that bathes our shores but on which we indiscriminately dump millions of litres of unpurified wastewater. A recent article in La Opinión de Málaga on 5 January stated that Malaga dumps 123 million cubic metres of wastewater into the sea every year, a real atrocity.

National problem, million-euro fine 

On 15 February, El País national newspaper published an article informing that, until that date, Spain had paid about 32.70 million euros in fines due to not complying with the wastewater treatment directive in municipalities with over 15,000 inhabitants. This has been the highest fine paid by Spain to the EU in history.

This breach of the directive led to a conviction from the European Court of Justice and the resulting fine being imposed by the European Commission. This fine continues to grow for as long as those 17 municipalities fail to treat their wastewater, an obligation that came into force in 2001, which means almost 19 years have passed since that directive was enacted.

Nerja, beautiful beaches with faecal waters

One of the many municipalities that have been fined and do not have a sewage treatment plant is Nerja. It is striking that this municipality, which such beauty  and such great beaches and cliffs, in 2020, is still dumping the sewage it generates directly into the ocean, through a collector located 1,200 metres from the coast.

Nerja has spent over 20 years on the project for its sewage treatment plant and even though it seems that this year may finally mark the end of the works, according to an article in Diario Sur on 6 January (fingers crossed), this does not detract from the sloppiness and lack of interest of the local and regional government have displayed about this project.

The situation is so obvious from an environmental standpoint that, following several complaints, the prosecutor’s office brought judicial proceedings against senior officials of the Nerja City Council for the illegal dumping of this untreated wastewater. One of the toxicology reports certified that all samples taken from five beaches in Nerja contained faecal organisms according to their tests.

Construction of the Nerja treatment plant was declared to be of public interest by the Government in 1996 but, 23 years later, it has not yet been completed. If you visited Nerja and the surrounding areas in 1996, you could see the large number of works that did get started and completed because there were many years with large capital movements but the faecal water purification plant was not so lucky. Other municipalities on the eastern coast, such as Torrox, Vélez Málaga and Rincón de la Victoria, do have a sewage treatment plant in operation.

Mouth of the Guadalhorce, a natural site with a “faecal” river

Another area that also presents a high degree of pollution due to illegal dumping is the mouth of the Guadalhorce river in the city of Malaga. This enclave is the last unspoiled beach in the city of Malaga and is home to a very significant ecosystem of flora and fauna, with a network of trails to move through it. However, in this river, municipalities as large as Alhaurín el Grande and Coín dump their untreated faecal waters, which also led to a fine being paid by the government of Spain.

The city of Malaga has reinvented itself as a multicultural European city, currently highly appreciated by foreign tourists due to its many urban development projects, mostly in real estate. But Malaga is unable to commit to a project in the mouth of the Guadalhorce, which could affect this unique space –as it is the last unspoiled one– to preserve its environmental value.

It is non-profit associations that are reforesting and trying to preserve this space altruistically, as our firm was able to witness during the conference we held with some of them last November.

The municipality of Coín, a peculiar case

For the town of Coín to be able to connect to the treatment plant in the lower Guadalhorce, it is necessary to build the 3 kilometres of collectors that were destroyed by the torrential rains in autumn 2018 but the Andalusia Council, along with the contracting company, continue to fight to decide who will pay for these repairs. Coín is also immersed in legal proceedings due to its failure to treat its wastewater. While the administrations argue, this collector continues broken and the faecal water from Coín is dumped directly into the Guadalhorce river.

Isolated homes and their regularisation through DAFO, a bad focus of faecal waters

Even though compared to large population centres, the impact of these homes is lower, it should be noted that there are many isolated homes existing in Malaga. In La Axarquía, municipalities such as Alcaucín, Viñuela, Competa, Periana and Torrox have thousands of rural homes, as well as towns in the Guadalhorce valley, such as Coín, Alhaurín el Grande and Alhaurín de la Torre. Likewise, municipalities such as Mijas or Ronda also have many houses on non-urban land.

Among the positive aspects of the DAFO these homes are required to have an individual and autonomous treatment system. It should be noted that this procedure is important for foreigners who buy and sell homes in the province.

What is the problem?

I see that one of the negative aspects is the requirement from the Andalusia Council for properties subject to DAFO to have a watertight septic tank, forbidding septic tanks with a biological filter. This guideline is a serious mistake and its effect is contrary to what is intended, which is to prevent these homes from polluting the land on which they are located.

Properties with a watertight tank habitually require (monthly or more frequently, depending on their use) a tanker to visit the property and empty the contents of the tank, which are then transferred to an authorised waste facility.

What is the alternative?

Allowing the use of septic tanks with a biological filter as a treatment system, as it would not be necessary to empty the tank and water would come out clean and purified. It may be necessary to request authorisation for the discharge point of this clean, filtered water, which could even be used for irrigation but, with this treatment system, a company would only need to clean the tanks once a year, which represents significant savings for owners.

What is happening?

The problem that we find with watertight septic tanks is the economic cost of each emptying, which leads many homeowners to resort to other illegal methods, to avoid inconveniences and economic costs. In many cases, they choose to install a watertight septic tank and, once the technician certifies it, a small hole is drilled at the bottom, through which faecal water is poured into groundwater, thereby dispending with the need to have a truck empty it and making it very difficult for this to be sanctioned.

It is appalling that, in some cities, it has been accepted or assumed that owners will not empty their watertight septic tanks and will drill a small hole in them. I would even dare to say that owners are given such a “solution” to prevent the inconvenience of emptying, as the DAFO only requires having a technician certify the installation of the watertight septic tank and, if a hole is drilled later, no one will notice.

However, with thousands of homes in the countryside, thinking that a truck would need to go empty the septic tank in each of them on a frequent basis, requires being naive or means that the Andalusia Council cares little about these discharges (I lean more towards the latter). I am also not very sure of where these trucks discharge the faecal waters they do collect.

Do not pollute the environment if you process the DAFO for your property

To prevent the situation above, which is absolutely filthy, in some of the DAFO we have processed, we have found this problem and, to prevent faecal waters from being discharged directly into the ground, we have advised owners that, once the watertight tank is installed and certified to process the DAFO, they install one with a biological filter next to it. This way, at least, the water they dump will be clean and not pollute the ground, while the owner will avoid all the financial cost and disruption entailed by emptying the tank periodically.

At least, with the second option, despite not being accepted officially by the Junta of Andalusian and many municipalities, faecal discharge is prevented, which is the main goal when it comes to the environment.

Conclusion

As you probably understand, this issue goes a long way but I believe that, with these few brushstrokes, you can see the general lack of environmental awareness in the administration as well as among many citizens. This is the sad reality.

Tourism in Malaga and the entire Mediterranean area is also not viewed with a perspective for the future, as we live in the short term and do not care for essential things for investors and tourists to continue to come to Malaga, as well as foreigners wishing to purchase a home to enjoy a high quality of life or just spend their holidays in Span.

Meanwhile, those of us who reside and live here most of the time are unaware of the large amount of pollution we generate and the damage we cause to the sea, rivers and streams (which are increasingly polluted). I do not see many complaints or movements among citizens protesting this situation.

Some of the damage is already irreparable but there is some that can be fixed.

Author: Gustavo Calero Monereo, lawyer at C&D Solicitors Torrox (Málaga, Andalusia)

 

 

THE PURCHASE OF HOMES AND DAFO/SAFO CERTIFICATES IN ANDALUSIA

DAFO certficate countryside Andalucia
DAFO certficate countryside Andalucia

Lately, in the purchase of rural homes, one of the most important points discussed between buyers and sellers is the procedure “Asimilado Fuera de Ordenación”, –DAFO or SAFO–. What it is, what its consequences are, who does it, who assumes the cost, etc.

Basic rules to buy in the countryside in Andalusia

Before talking about this procedure, and based on my experience with clients looking for a home in the countryside, it is necessary to mention that, in non-development land in Andalusia –rural land–, it is not possible:

  1. To build homes, unless the intention is to engage in agricultural or livestock-farming activities in a professional capacity on the parcel.
  2. Existing buildings may not be expanded and/or remodelled, both inside and outside. People have to purchase what is already built and no changes are legally allowed.
  3. It is permitted to build with the intention to operate rural accommodation or a bed & breakfast, but it is necessary to carry out a preliminary operational project – called in Proyecto de Actuación -, that the Government of Andalusia must approve. This procedure can take over 6 months and it is difficult to obtain a positive response from the Regional Government.

It is necessary to take into account that most homes currently sold in the Andalusian countryside are illegal or irregular, i.e. if the authorities had done their work, they should not have allowed construction and, therefore, they should not exist.

The case is that, for most buildings, it is not possible to start any penalty procedures against buildings built without a licence or with an illegal licence on non-development land due to the time elapsed.

This means that legal responsibility is time-barred since over six years have elapsed since the end of construction. When we refer to non-development land with any special protection, the period of six years does not apply.

What buildings can and cannot be constructed in the countryside

In non-development land, a construction licence cannot be granted to remodel or rebuild. For instance, in the event of a fire when the home would be completely destroyed, it´s not allowed be rebuilt.

It is possible to grant a licence for small repairs or modifications necessary for the habitability and safety of the home, such as, for instance, replacing part of the roof or a wall that has been damaged or has collapsed.


Why was DAFO/SAFO created?

Because of the above, the Government of Andalusia approved regulations in 2012 with the idea to regularise, not legalise, thousands of homes built on non-development land –rural land–, in breach of urban-planning regulations. Since 2012, City Councils have started to create internal regulations to govern this procedure.

Speaking colloquially, with the resolution of Assimilated out of Ordination – Asimilado Fuera de Ordenación -, the goal is to have a record with a specific date of what has been built on that property –both inside and outside each building–, how many years have elapsed since construction and to certify that the home can continue to exist without penalties in the future, even though it will not be possible to expand it and/or remodel it or to build new structures.

This is not a legalisation because the home is left outside urban regulations –as it was built illegally– but it is a regularisation as the City Council itself certifies this legal situation and confirms in writing that it will not be possible for this home to be subject to a penalty due to the time elapsed.

The legal situation of a home in non-development land does not change after receiving the resolution of DAFO/SAFO from City Hall, i.e. the home will continue to be illegal as it was built on land where construction is not allowed but, since the time limit established by law to issue a penalty for this infringement has elapsed, this procedure against the owner cannot be started due to this situation. With or without a DAFO certificate, the legal situation remains the same.

DAFO/SAFO Procedure

In this procedure, it is necessary to have a project by an architect, to pay a fee on the value of the building on the date it was built, which may range from 2.5% to 4.5% depending on the City Council where the property is located, and the City Council will also verify the water and electricity supply as well as the need for a septic tank so that the home can comply with regulations.

It will actually be the architect paid by the owner who will inform, in his or her project, everything necessary for the home to be eligible for a DAFO certificate. Once the project has been submitted, the architect from the City Council will visit the property to inspect it and verify whether it complies with the requirements for a DAFO certificate.

Once this procedure is completed, which may take between 4 and 6 months, the City Council will issue a resolution certifying Assimilated out of Ordination – Asimilado Fuera de Ordenación -, from Regulation for that home and all structures built on the plot.

Is DAFO mandatory for the sale of a home?

To buy or sell a property, holding a DAFO/SAFO certificate is not a legal requirement. That being said: is obtaining a DAFO/SAFO certificate for a property good or bad?

In favour of the DAFO certificate, we can mention that buyers will have the certainty that what has been built already cannot be subject to a penalty and/or demolished because it is accredited in writing that legal responsibility is time-barred, with the certificate from the City Council granting the DAFO certificate. Likewise, it will provide certainty that the City Council will not require you to obtain a DAFO/SAFO certificate for the home in the future, as the procedure was already completed at the time of purchase.

It should be taken into account that, currently, nearly no City Council offers any information in writing regarding a property built on non-development land unless it holds a DAFO certificate or processes it.

This means that, if you go to get something in writing, they tell you that you certainly can but you first need to process the DAFO certificate for your home. This means that, if you do not want to obtain a DAFO certificate for any reason, it will be very difficult for buyers or their lawyers to obtain information in writing about the property.

The downside of having the DAFO is that, if there are any structures or remodelling –inside or outside– completed within the last six years or if the land on which the property is located is subject to any type of protection (and it can´t be proven that the buildings are old enough), applying for this procedure can only cause problems to the owner as the City Council will be required to initiate penalty procedures.

Likewise, if the new owner is thinking about remodelling after buying the home –ignoring the advice of a good lawyer–, the City Council will already be perfectly aware of what had been built before and it will be easier for them to prove that the structure has been remodelled or some variation has taken place.

It is also necessary to take into account that it may be possible for a property to obtain a DAFO certificate in 2016 and remodelling or expansion of that home to take place in 2017. What I mean with this is that complete certainty in this sense can never be achieved.

Current status of the DAFO certificate

It is true that the processing of this certificate is starting to become common at City Councils because they have also realised that it´s tax payment is an important source of income.

Many City Councils have an unwritten rule to start an application automatically when they receive or someone requests any type of information and/or documentation about a property on rural land, so we can say the owner would be obliged to make the DAFO.

In the situation mentioned above, many buyers want to prevent having to pay for the cost of the procedure themselves, which has resulted in an increasing number of buyers requiring the seller to process it and pay for it.

It is also true that, in some sale transactions where a DAFO certificate is not desired, a reduction in the sale price is usually agreed with the seller and the new owner will decide whether to apply for it in the future.

Is possible to get a mortgage in a property with DAFO?

Another issue that some clients ask about, is whether it is possible to grant a mortgage for a property with a DAFO certificate.

On this matter, the reality of the property market goes beyond the legal limitations in force since 2009 as, even though it is not theoretically possible to grant a mortgage for buildings or structures exempt from regulations, the reality is that there are banking entities that do grant mortgages for properties out of ordination or assimilated out of ordination, i.e. rural properties.

In my opinion, if there is money to be made, banks will not stop granting mortgages for properties of this type -with or without DAFO- regardless of what the Decree of 2009 says. Obviously, mortgages approved for these properties usually offer a lower loan amount and not all banks offer mortgages on rural land.

Buying and selling homes in rural land

When buying and selling homes in non-development land, for them to be able to be included in the property market, with or without a DAFO certificate, there are no limitations or restrictions. This means that most of these properties are registered in the Property Registry and in the Cadastre and have already been sold or bought on different occasions even though few yet hold a DAFO certificate.

Currently, there continues to be an important portfolio of potential buyers interested in properties in the countryside.

The important thing, when someone is looking to buy a property on rural land, is for buyers to know what they are buying, be aware of the legal limitations of properties on rural land, and receive specific legal information about the property, with or without a DAFO certificate. This will enable them to make a decision with full awareness of the legal status of the property.

A lawyer to buy a property?

Lastly, it’s not that we’re trying to promote our services –well, maybe a little–, but in the purchase of a home, especially for homes like these, having a lawyer is never a bad idea as his or her fee will cost very little in comparison to the purchase price and can save you from many headaches or costly problems in the future.

 

Author: Gustavo Calero Monereo, lawyer at C&D Solicitors Torrox (Málaga, Andalusia)

 

 

ENGLISH-SPEAKING LAWYERS IN MALAGA FOR LEGAL ADVICE ON BUYING, SELLING OR INHERITING IN ANDALUSIA

Please enable JavaScript in your browser to complete this form.
Terms and conditions
Newsletter
C&D Solicitors Malaga, Spain
Colegio de Abogados de Mälaga
TORROX OFFICE

MON/TUE/THU: 09:00 - 18:30
WED/FRI: 09:00 – 15:00

LOCATION: 40 KM EAST FROM MALAGA, 10 KM WEST FROM NERJA.
FREE PARKING IN FRONT OF ALDI SUPERMARKET
(ENTRANCE AT THE BACK).

MALAGA OFFICE

LOCATION: MALAGA CENTER
(LA MALAGUETA).
PARKING CERVANTES, C/ CERVANTES 6

Need help?